Skip to product information
Simplicity Vacuums Premium Allergy Upright Vacuum Cleaner – Multi-Surface Bagged Vacuum Cleaner for Home with Charcoal HEPA Filter Media, Powerful Pet Hair Pickup, Brushroll Activation Switch, S26

Simplicity Vacuums Premium Allergy Upright Vacuum Cleaner – Multi-Surface Bagged Vacuum Cleaner for Home with Charcoal HEPA Filter Media, Powerful Pet Hair Pickup, Brushroll Activation Switch, S26

$339.99
Sale price  $339.99 Regular price  $399.99

Brand: Simplicity

Color: White

Features:

  • Controlled Brushroll Activation – The upright vacuum cleaners for home include a convenient switch that controls the brushroll, activating it only in carpet mode and pausing on hard floors to help protect surfaces and reduce debris scatter.
  • 4-Stage HEPA + Charcoal Filtration – Our upright vacuums are designed for cleaner, fresher air with four genuine filtration layers: a sealed outer bag compartment, charcoal-infused HEPA media bag, electrostatic charcoal pre-filter foam, and certified HEPA exhaust filter.
  • Effortless Maneuverability – This heavy duty vacuum cleaner moves smoothly on 360° swivel wheels and lays flat under furniture, allowing easy cleaning in corners, under beds, and around tight areas.
  • Automatic Height Adjustment – The carpet vacuum cleaner transitions seamlessly between hard floors and carpeted surfaces.
  • Above-Floor Cleaning – Our pet vacuum cleaners for home include a wand, stretch hose, and crevice tool for vents and tight spaces, plus dusting and upholstery attachments for stairs, furniture, and pet hair removal.
  • Maintenance – For best performance, replace the vacuum bag and filter regularly. Do not reuse bags once full. Routine replacement helps extend motor life and maintain strong suction.

Warranty: 1 year limited warranty.

UPC: 098612140245

EAN: 0098612140245

Package Dimensions: 13.5 x 12.5 x 44.0 inches

You may also like